{"id":9167,"date":"2024-03-18T00:55:37","date_gmt":"2024-03-18T00:55:37","guid":{"rendered":"https:\/\/theasiantelegraph.global\/?p=9167"},"modified":"2024-03-18T00:55:38","modified_gmt":"2024-03-18T00:55:38","slug":"ntdc-set-to-initiate-three-solar-power-projects-in-punjab","status":"publish","type":"post","link":"https:\/\/theasiantelegraph.global\/?p=9167","title":{"rendered":"NTDC set to initiate three solar power projects in Punjab"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"856\" height=\"478\" src=\"https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/03\/9262838411710686432.jpg\" alt=\"\" class=\"wp-image-9168\" srcset=\"https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/03\/9262838411710686432.jpg 856w, https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/03\/9262838411710686432-300x168.jpg 300w, https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/03\/9262838411710686432-768x429.jpg 768w\" sizes=\"(max-width: 856px) 100vw, 856px\" \/><\/figure>\n\n\n\n<p>Islamabad ; National Transmission and Dispatch Company will establish three solar power projects in Punjab to generate 4200 megawatt electricity.<\/p>\n\n\n\n<p>According to NTDC spokesperson, a 600 Mega Watt solar power project will be established in the Kot Addu district on 2,553 acres of land.<\/p>\n\n\n\n<p>Similarly, a solar project of 1200 MW will be installed in Layyah and 600 MW in Jhang to reduce dependence on expensive fuel.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad ; National Transmission and Dispatch Company will establish three solar power projects in Punjab to generate 4200 megawatt electricity. According to NTDC spokesperson, a 600 Mega Watt solar power&hellip; <\/p>\n","protected":false},"author":8,"featured_media":9168,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[206,247,246,245],"class_list":["post-9167","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-ministry-of-information-technology","tag-neeca","tag-solor-energy","tag-solor-technology"],"_links":{"self":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/9167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9167"}],"version-history":[{"count":1,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/9167\/revisions"}],"predecessor-version":[{"id":9169,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/9167\/revisions\/9169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/media\/9168"}],"wp:attachment":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}