{"id":19219,"date":"2024-09-30T05:02:42","date_gmt":"2024-09-30T05:02:42","guid":{"rendered":"https:\/\/theasiantelegraph.global\/?p=19219"},"modified":"2024-09-30T05:02:42","modified_gmt":"2024-09-30T05:02:42","slug":"iesco-provides-power-services-to-customers-for-connection","status":"publish","type":"post","link":"https:\/\/theasiantelegraph.global\/?p=19219","title":{"rendered":"IESCO provides power services to customers for Connection"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"512\" height=\"512\" src=\"https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/09\/FB_IMG_1727672211358.jpg\" alt=\"\" class=\"wp-image-19220\" srcset=\"https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/09\/FB_IMG_1727672211358.jpg 512w, https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/09\/FB_IMG_1727672211358-300x300.jpg 300w, https:\/\/theasiantelegraph.global\/wp-content\/uploads\/2024\/09\/FB_IMG_1727672211358-150x150.jpg 150w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/figure>\n\n\n\n<p>ISLAMABAD: The Islamabad Electricity Supply Company (IESCO) provides power services to Rawalpindi, Chakwal, Attock, Jhelum, and Islamabad.<\/p>\n\n\n\n<p>For those constructing new homes within IESCO\u2019s jurisdiction, a lump sum fee package starting at Rs 8,500 is available for new electricity connections.<\/p>\n\n\n\n<p>Steps for Single Phase IESCO Meter Connection:<br>Step 1: Collect five copies of the Application and Agreement (A&amp;A) form, along with the Abridged Conditions of Supply, from IESCO\u2019s Subdivisional Offices or Customer Service Centers.<br>Step 2: Complete all five copies of the A&amp;A form and submit them with the following documents:<br>Property ownership proof (e.g., registry).<br>Consumer electricity bill of a neighboring property.<br>Wiring test report (for non-domestic connections).<br>Affidavit stating no prior connection at the premises.<br>Photocopy of the owner\u2019s national identity card.<br>Photocopy of witness\u2019s national identity card.<br>\u201cNo Objection Certificate\u201d from the landlord (if the applicant is a tenant).<br>Installation Time Frame:<br>Urban areas: Approx. 35 days.<\/p>\n\n\n\n<p>Rural areas: Approx. 45 days.<\/p>\n\n\n\n<p>IESCO New Electricity Connection Fee:<br>Up to 20 meters service line: Rs8,500.<\/p>\n\n\n\n<p>Above 20 meters and up to 30 meters: Rs10,500.<\/p>\n\n\n\n<p>Following is complete fee structure:<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISLAMABAD: The Islamabad Electricity Supply Company (IESCO) provides power services to Rawalpindi, Chakwal, Attock, Jhelum, and Islamabad. For those constructing new homes within IESCO\u2019s jurisdiction, a lump sum fee package&hellip; <\/p>\n","protected":false},"author":8,"featured_media":19220,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[1723],"class_list":["post-19219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","tag-islamabad-electric-supply-company-iesco"],"_links":{"self":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/19219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19219"}],"version-history":[{"count":1,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/19219\/revisions"}],"predecessor-version":[{"id":19221,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/posts\/19219\/revisions\/19221"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=\/wp\/v2\/media\/19220"}],"wp:attachment":[{"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theasiantelegraph.global\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}